When Aptiv decided to relocate their product testing and validation laboratory from Kokomo to Westfield, they turned to Applied to provide the mechanical, electrical, plumbing, and technology engineering for the installation of the new equipment and building systems. Our design services included process water cooled chilled water system, temperature and humidity control, compressed air system, condensate piping system, and power to the environmental test chambers. Specialty areas requiring critical environments included an electro-static discharge (ESD) testing room, a dynamics testing room, and a building utilities room. We also assisted Aptiv with the commissioning of the new chiller and the temperature and low humidity testing room.
Validation Lab Relocation
Market:
Advanced Manufacturing
Project Size:
50,000 SF
Construction Cost:
$4,200,000 (est.)
Completion Date:
Fall 2020